Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision | |||
| report [2025/06/25 14:20] – team5 | report [2025/06/25 14:41] (current) – [3.3 Cost] team5 | ||
|---|---|---|---|
| Line 454: | Line 454: | ||
| </ | </ | ||
| </ | </ | ||
| - | |||
| **Total Price per unit: | **Total Price per unit: | ||
| + | \\ | ||
| === - Project Cost Overview === | === - Project Cost Overview === | ||
| Line 465: | Line 465: | ||
| \\ | \\ | ||
| Below is a overview of the prototype component costs, including quantity, unit price (with VAT) and the links to the websites:\\ | Below is a overview of the prototype component costs, including quantity, unit price (with VAT) and the links to the websites:\\ | ||
| + | < | ||
| + | <table tPrototype Components> | ||
| + | < | ||
| + | <WRAP center> | ||
| + | |||
| + | ^ Components ^ Links ^ Price with VAT (€) ^ Quantity ^ | ||
| + | | **Flow sensor (water)** | [DigiKey](https:// | ||
| + | | **InfraRed (Bottle identification)** | [Botnrc](https:// | ||
| + | | **LEDs or LCD status display** | [Mauser.pt](https:// | ||
| + | | **Push button (for fill-in start)** | [Metal Illuminated Switch](https:// | ||
| + | | **ESP32 board** | [mouser.pt](https:// | ||
| + | | **Electric Motor** | [MOT-81656 ISL Pr](https:// | ||
| + | | **Food-grade silicone tubing**| [Leroy Merlin](https:// | ||
| + | | **Solenoid Valve** | [Seeed 111990004](https:// | ||
| + | | **10 kΩ restistor ** | [10 kΩ restistor ](https:// | ||
| + | | **Flyback diode ** | [Diode DigiKey ](https:// | ||
| + | | **N-MOSFETs | ||
| + | | **12 V, 3 A Power Supply ** | [Power supply ](https:// | ||
| + | | **DC-DC converter (12 V to 5 V) ** | [Botnroll](https:// | ||
| + | |||
| + | |||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | |||
| \\ | \\ | ||
| **The personnel cost** is based on an assumed hourly rate of €15, representing the average salary of a junior engineer. Each of the six team members is estimated to have worked 20 hours per week over a six-month period.\\ | **The personnel cost** is based on an assumed hourly rate of €15, representing the average salary of a junior engineer. Each of the six team members is estimated to have worked 20 hours per week over a six-month period.\\ | ||