| report [2025/06/25 13:03] – [3.2 Time] team5 | report [2025/06/25 14:41] (current) – [3.3 Cost] team5 | ||
|---|---|---|---|
| Line 454: | Line 454: | ||
| </ | </ | ||
| </ | </ | ||
| + | **Total Price per unit: | ||
| \\ | \\ | ||
| - | **Total Price: | + | === - Project Cost Overview === |
| + | \\ | ||
| + | The total cost of the project consists of two main components: | ||
| + | |||
| + | | ||
| + | * **Prototype cost**: the cost of all components used to build the prototype.\\ | ||
| + | \\ | ||
| + | Below is a overview of the prototype component costs, including quantity, unit price (with VAT) and the links to the websites: | ||
| + | < | ||
| + | <table tPrototype Components> | ||
| + | < | ||
| + | <WRAP center> | ||
| + | |||
| + | ^ Components ^ Links ^ Price with VAT (€) ^ Quantity ^ | ||
| + | | **Flow sensor (water)** | [DigiKey](https:// | ||
| + | | **InfraRed (Bottle identification)** | [Botnrc](https:// | ||
| + | | **LEDs or LCD status display** | [Mauser.pt](https:// | ||
| + | | **Push button (for fill-in start)** | [Metal Illuminated Switch](https:// | ||
| + | | **ESP32 board** | [mouser.pt](https:// | ||
| + | | **Electric Motor** | [MOT-81656 ISL Pr](https:// | ||
| + | | **Food-grade silicone tubing**| [Leroy Merlin](https:// | ||
| + | | **Solenoid Valve** | [Seeed 111990004](https:// | ||
| + | | **10 kΩ restistor ** | [10 kΩ restistor ](https:// | ||
| + | | **Flyback diode ** | [Diode DigiKey ](https:// | ||
| + | | **N-MOSFETs | ||
| + | | **12 V, 3 A Power Supply ** | [Power supply ](https:// | ||
| + | | **DC-DC converter (12 V to 5 V) ** | [Botnroll](https:// | ||
| + | |||
| + | |||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | |||
| + | \\ | ||
| + | **The personnel cost** is based on an assumed hourly rate of €15, representing the average salary of a junior engineer. Each of the six team members is estimated to have worked 20 hours per week over a six-month period.\\ | ||
| + | \\ | ||
| + | **The calculation is as follows: | ||
| + | 6 people × 6 months × 4 weeks/month × 20 hours/week × €15/hour = **€43, | ||
| + | |||
| + | The total cost of the prototype components, including VAT, amounts to **€91.39**.\\ | ||
| + | \\ | ||
| + | **Total estimated project cost:**€43, | ||
| + | |||
| Line 763: | Line 808: | ||
| | C | Project Backlog | | C | Project Backlog | ||
| | D | Global Sprint Plan | Done | | D | Global Sprint Plan | Done | ||
| - | | E | Initial Sprint Plan | + | | E | Initial Sprint Plan |
| - | | F | Release Gantt Chart | + | | F | Release Gantt Chart |
| - | | G | Upload the List of Components and Materials | To do | + | | G | Upload the List of Components and Materials | Done |
| - | | H | Upload the detailed System Schematics & Structural Drawings | + | | H | Upload the detailed System Schematics & Structural Drawings |
| - | | I | cardboard scale model | + | | I | cardboard scale model |
| - | | J | Interim Report and Presentation | + | | J | Interim Report and Presentation |
| - | | K | 3D Model Video | To do | + | | K | 3D Model Video | Done |
| - | | L | Final list of materials | + | | L | Final list of materials |
| - | | M | Interim Report | + | | M | Interim Report |
| - | | N | Packaging Solution | + | | N | Packaging Solution |
| - | | O | Functional Test | To do | + | | O | Functional Test | Done |
| - | | P | Final Report, Presentation, | + | | P | Final Report, Presentation, |
| - | | Q | Final Presentation | + | | Q | Final Presentation |
| - | | R | Folder | To do | + | | R | Folder | Done |
| - | | S | Poster, brochure and leaflet | + | | S | Poster, brochure and leaflet |
| - | | T | Prototype | + | | T | Prototype |
| </ | </ | ||
| Line 793: | Line 838: | ||
| | 0 | A | 4 | All | P,O,K,T,A,M | | | 0 | A | 4 | All | P,O,K,T,A,M | | ||
| | 1 | B,G | 2 | All | P,T,O | | | 1 | B,G | 2 | All | P,T,O | | ||
| - | | 2 | C, | + | | 2 | C, |
| - | | 3 | H,I,J | 3 | All | | + | | 3 | H,I,J | 3 | All | P, |
| - | | 4 | J,K | 3 | All | -| | + | | 4 | J,K | 3 | All | P,O,K,T,A,| |
| - | | 5 | J,K,M | 3 | All | | + | | 5 | J,K,M | 3 | All | |
| - | | 6 | K | 4 | All | - | | + | | 6 | K | 4 | All | O,A | |
| - | | 7 | L | 2 | All | | + | | 7 | L | 2 | All | |
| - | | 8 | L | 2 | All | | + | | 8 | L | 2 | All | |
| - | | 9 | N | 4 | All | | + | | 9 | N | 4 | All | |
| - | | 10 | N, O | 3 | All | | + | | 10 | N, O | 3 | All | |
| - | | 11 | O | 3 | All | | + | | 11 | O | 3 | All | |
| - | | 12 | O ,P | 3 | All | | + | | 12 | O ,P | 3 | All | P, |
| - | | 13 | P | 4 | All | - | | + | | 13 | P | 4 | All | P, |
| - | | 14 | P,T,R | 4 | All | | + | | 14 | P,T,R | 4 | All | |
| - | | 15 | P+R+S+T | + | | 15 | P+R+S+T |
| - | | 16 | R+S+T | 4 | All | - | | + | | 16 | R+S+T | 4 | All | P,O,K,T,A,M| |
| </ | </ | ||
| Line 822: | Line 867: | ||
| | 0 | A | All | P,O,K,T,A,M | Done | | | 0 | A | All | P,O,K,T,A,M | Done | | ||
| | 1 | B,G | All | P,T,O | Done | | | 1 | B,G | All | P,T,O | Done | | ||
| - | | 2 | C, | + | | 2 | C, |
| - | | 3 | H,I,J | All | + | | 3 | H,I,J | All |
| - | | 4 | J,K | All | - | Not started | + | | 4 | J,K | All | P, |
| - | | 5 | J,K,M | All | - | Not started | + | | 5 | J,K,M | All | P, |
| - | | 6 | K | All | - | Not started | + | | 6 | K | All | O, A| Done | |
| - | | 7 | L | All | - | Not started | + | | 7 | L | All | K,T,A |
| - | | 8 | L | All |- | + | | 8 | L | All |K | Done |
| - | | 9 | N | All | - |Not started | + | | 9 | N | All | P | Done | |
| - | | 10 | N,O | All | + | | 10 | N,O | All |
| - | | 11 | O | All | - | Not started | + | | 11 | O | All | M, T |
| - | | 12 | O,P | All | + | | 12 | O,P | All |
| - | | 13 | P | All | + | | 13 | P | All |
| - | | 14 | P,R,T | All | + | | 14 | P,R,T | All |
| - | | 15 | P+R+S+T | All | + | | 15 | P+R+S+T | All |
| - | | 16 | R+S+T | All | - | + | | 16 | R+S+T | All | P, |
| </ | </ | ||
| </ | </ | ||
| Line 911: | Line 956: | ||
| | Chapter 1: Introduction | M | 1 | 2 | Done | | | Chapter 1: Introduction | M | 1 | 2 | Done | | ||
| | Chapter 3: Project Management | P,O | 2 | 2 | Done | | | Chapter 3: Project Management | P,O | 2 | 2 | Done | | ||
| - | | Chapter 4: Marketing Plan | M | 4 | 5 | Done | | + | | Chapter 4: Marketing Plan | K | 4 | 5 | Done | |
| - | | Chapter 5: Eco-efficiency Measures for Sustainability| T | 3 | 3 | Done | | + | | Chapter 5: Eco-efficiency Measures for Sustainability| T,K | 3 | 3 | Done | |
| | Chapter 6: Ethical and Deontological Concerns | M | 5 | 5 | Done | | | Chapter 6: Ethical and Deontological Concerns | M | 5 | 5 | Done | | ||
| | Chapter 7.1-7.4: Project Development | M | 2 | 3 | Done | | | Chapter 7.1-7.4: Project Development | M | 2 | 3 | Done | | ||
| Line 931: | Line 976: | ||
| ^ Product Backlog Item ^ Assignee ^ Planned Effort [h] ^ Real Duration [h] ^ Status ^ | ^ Product Backlog Item ^ Assignee ^ Planned Effort [h] ^ Real Duration [h] ^ Status ^ | ||
| | Interim Presentation | M, P, R, K, T, O | 3 | . | Done | | | Interim Presentation | M, P, R, K, T, O | 3 | . | Done | | ||
| - | | Interim Report | 1 | . | . | Done | | + | | Interim Report | P, |
| </ | </ | ||
| Line 967: | Line 1012: | ||
| | Chapter 8: Economic Viability | M | 3 | 3 | Done | | | Chapter 8: Economic Viability | M | 3 | 3 | Done | | ||
| | Sprint 7 Report | P | 0.5 | 0.5 | Done | | | Sprint 7 Report | P | 0.5 | 0.5 | Done | | ||
| - | | 3D model video | P | 3 | 5| Completed outside sprint| | + | | 3D model video | O,P | 3 | 5| Completed outside sprint| |
| \\ | \\ | ||
| === 3.11.8 Sprint 8 01/ | === 3.11.8 Sprint 8 01/ | ||
| Line 990: | Line 1035: | ||
| ^ *Product Backlog Item* | *Assignee* | *Planned Effort [h]* | *Real Duration [h]* | *Status* | | ^ *Product Backlog Item* | *Assignee* | *Planned Effort [h]* | *Real Duration [h]* | *Status* | | ||
| | Final Prototype Assembly | T, O, K | 6 | 6 | Done | | | Final Prototype Assembly | T, O, K | 6 | 6 | Done | | ||
| - | | Final Report Draft | M, P, R | 4 | 4 | Done | | + | | Final Report Draft | M, P, R,K | 4 | 4 | Done | |
| | Poster for Final Presentation | R, K | 2 | 2 | Done | | | Poster for Final Presentation | R, K | 2 | 2 | Done | | ||
| | Sprint 10 Report | P | 0.5 | 0.5 | Done | | | Sprint 10 Report | P | 0.5 | 0.5 | Done | | ||